News


PROJECT PROFAX: CLINIC DARMSTADT

Heating, ventliation and cooling system with individual-room controllers

DDC-control, MSR-plant

Electric boxes and installing

Automation system for the building



PROJECT PROFAX: WATER PARK STARNBERG

Electrical panel with DDC control, visualization of the supervisory sytem and touchpanel for the facility of centralized heating and ventilation and treatment bathing waters.

Installation and startup service included.


PROJECT PROFAX: POLICE HEADQUARTERS ULM

Heating, ventilation and cooling system with individual-room controllers

DDC-Control, MSR-plant

Electric boxes and installing

Automation system for the building


PROJECT PROFAX: HS PFORZHEIM

Heating, ventilation and cooling system with individual-room controllers

DDC-Control, MSR-plant

Electric boxes and installing

Automation system for the building

PROJEKT PROFAX: FÖRDERZENTRUM UNTERHACHING

Als Sonderpädagogisches Förderzentrum umfasst die Schule heute die Förderschwerpunkte und ca. 250 Schüler/innen besuchen die Schule.

Der neu zu errichtende Gelenk-/Verbindungsbau beinhaltet eine Pausenhalle, einen Mehrzweckraum/Nebenraum, ein Stuhllager, eine Aufwärmküche, einen Essensbereich, einen Aufenthaltsraum, 4 Gruppenräume, ein Therapiebad sowie eine schulvorbereitende Einrichtung / heilpädagogische Tagesstätte. Zusätzlich vorgesehen sind eine Zweifachsporthalle, ein Technikzentrale zur Anbindung aller 3 Gebäude sowie Freisportflächen.

Neubau mit Heiz-, Kälte- und Lüftungszentrale.

E-Schränke, DDC-Regelung, Anschlussarbeiten, Visualisierung über zentrales Gebäudeleitsystem aller Gebäude der Schule.

PROJEKT PROFAX: NEU- UND UMBAU KLINIKUM BAYREUTH BETRIEBSSTÄTTE HOHE WARTE

Das Klinikum Bayreuth hat den Ausbau und die Modernisierung beauftragt. Der 7. Bauabschnitt umfasst u.a den Neubau eines Schwimm- und Bewegungsbades sowie den Neubau und die Erweiterung der Therapie- und Medizintechnikbereiche. Die Gesamtfläche wird um rund 2.025 Quadratmeter auf zukünftig 4.105 Quadratmeter erweitert.

Gebäudeautomation bestehend aus Heizung, Kühlung und Lüftung, samt Regelung.

PROJEKT PROFAX: STUDENTENHAUS LANGEMARCKPLATZ IN ERLANGEN

Die vom Studentenwerk Erlangen-Nürnberg betriebene Mensa Studentenhaus befindet am Langemarckplatz.

Die Mensa wurde grund- und energetisch-saniert.

Arbeiten welche die Firma Profax betreffen:

Heiz-, Kälte- und Lüftungszentrale und Einzelraumregelung.

E-Schränke, DDC-Regelung, Einzelraumregelung, Verkabelung, Anschlussarbeiten, Visualisierung.

PROJECT PROFAX: OFFICIAL RESIDENCE OF THE STATE MINISTRY OF BADEN-WÜRTTEMBERG-VILLA REITZENSTEIN STUTTGART

The Villa Reitzenstein in Stuttgart is the official residence of the State Ministry of Baden-Wuerttemberg and the incumbent Prime Minister . It is located in the district of Stuttgart-Ost .

The Villa Reitzenstein itself is redeveloped .

Energetic rennovation, heating, cooling and ventilation unit and individual room control.

E-cabinets, DDC-control, individual room control, wiring, connection work, visualization over central building management system of all buildings of the State Department.

PROJECT PROFAX: DISTRICT COURT GÜNZBURG

The new building on the 4000 square meter ground will be built in the climate-friendly and energy-efficient passive house construction and designed completely barrier-free. 

Works which concern the company Profax:

A modern, efficient building automation with DDC-control and building control. Through the installation of room temperature sensors with setpoint adjusters, connected via a bus system with the DDC and the GLT, the temperature for each room is individually adjustable. The cooling effort is generated by gas heat pumps.

PROJECT PROFAX : NEW RED CROSS HOSPITAL WERTHEIM

The newly constructed stationary hospital building is on a plot at Berliner Ring / Bestenheider trail in Wertheim on the Main . At this location the hospital Wertheim GmbH builds a new construction on four levels.

Works which concern the company Profax:

According to the different levels and areas 8 different ISP (information centers) are mounted. These control the following facilities: refrigeration, heating CHP BW, operating rooms, central HVAC, medical gases and sanitary HVAC, integrating third-party systems.

Our mission is to design, manufacture, supply, programm and commission the ISP’s.

PROJECT PROFAX: FRAUNHOFER INSTITUTE FOR BUILDING PHYSICS-HOLZKIRCHEN

The Fraunhofer Institute for Building Physics ( IBP ), also called " Fraunhofer IBP ", is an institution of the Fraunhofer Society for the Promotion of Applied Research.

Works which concern the company Profax:

The ventilation systems are holistically regulated and controlled by the building automation.

Heat generation: the components 1/2/3 are supplied via a newly constructed gas boiler in the basement of the BT1 with warm water pump . The heat distribution is treated with warm water pump via a distributor in the central heating BT1 with the breakdown of the heating circuits.

PROJECT PROFAX: BIOSYS-THE MAIN BUILDING OF THE LUDWIG MAXIMILIAN UNIVERSITY OF MUNICH

Since 1835 the main building of the university is the central building of the Ludwig-Maximilians-University in Munich.

Profax carried out heating systems, refrigeration, ventilation and air and the conditioning, process heat,-cooling energy- and vetilation systems building automation

Ventilation equipment for laboratories, conference room, seminar rooms. Exhaust air systems for fume cupboards, safety and solvent cabinets. Exhaust air enthalpy use, heating and annealing above heat recovery.

The completion of the construction is expected for the end of february 2016.

PROJECT PROFAX: CONSTRUCTION AND RENOVATION OF THE CLINIC CRAILSHEIM

In the municipality of Crailsheim in 2010 was decided to reconvert the existing hospital for 54 million euros. The construction of the new building with a floor area of 16,226 square meters, divided into 5 levels and an additional equipment room on the roof, was started in May 2013.

The company Profax initiated work in the spring of 2014.

central heating, refrigeration systems, ventilation systems, room control, building system

Current state of works:

The wiring in the usage levels had been completed, the switch cabinets were supplied and the heating is operable.

PROJECT PROFAX: THE AUGSBURG HOSPITAL

The Augsburg Hospital is the only care hospital in Bavarian Swabia with maximum maintenance, an academic teaching hospital and with approximately 1,750 beds one of the largest hospitals in Germany.

The building automation was executed by Profax consisting of heating, cooling and ventilation including control of several operating rooms, individual room control of the patient's room, heating and cooling of the art rooms and offices, visualization of installations via a superordinate building management system of the company Johnson Controls.

PROJECT PROFAX : PRISON AUGSBURG IN GABLINGEN – PENITENTIARY AUGSBURG

The prison Gablingen is a part of the Penitentiary Augsburg .

Building automation was executed by the Profax consisting of heating , cooling and ventilation including regulation for serveral buildings.

E - cabinets , DDC-control ,visualization over central building management system for the heating and ventilation system were carried out by the company Profax .


Abteilung Service

Unsere Serviceabteilung wurde ausgebaut: 

Direkt Wahl: +39 0471 17 26 691

Der Service ist auch außerhalb der Arbeitszeiten erreichbar: Mobil Telefonnummer: +39 335 60 25 976, E-Mail Adresse: Service1@profax.it

Wir möchten auch nach Abschluss der Anlage für Sie da sein.


Solche Schreiben tun gut!


Sauter Facts

SAUTER Facts, das Kundenmagazin der Fr. SAUTER AG, informiert zwei Mal im Jahr mit wechselnden thematischen Schwerpunkten über strategische und technische Entwicklungen, internationale Marktaktivitäten und interessante Referenzobjekte.

Unter Download finden Sie die letzte Ausgabe Nr. 31.


Interne Schulung in der Firma Profax: Software Kühlanlagen

Themen der Schulung:

-Softwarestandard Kühlanlagen

-Konfiguration der Software

-Wichtige Hinweise zur Softwareerstellung der Kühlanlagen; Was ist zu beachten

-Systeme: Saia, Labview, Seneca (Mod. bus Ein/Ausgänge)

-Kurze Einführung zu den älteren Anlagen


In der Firma Profax G.m.b.H. wurde ein Web Aufgaben Verwaltungsprogramm entwickelt, dass die Aufgabenverteilung und die

Fälligkeitsüberwachung vereinfachen soll.

Start im Januar 2015.